June 27, 2012 Tepco handout with summarized translation by Fukushima Diary:
Since 14:01 of 6/27/2012, the coolant system of SFP2 has been stopped. They confirmed the cooling pump of system A automatically stopped [...]The water temperature was 22.9℃, it is estimated to increase at 0.24℃/h by Tepco.
Tepco states they confirmed no water leakage at 14:40, and the water temperature is under control.
Source: http://www.tepco.co.jp/nu/fukushima-np/images/handouts_120627_03-j.pdf
"Destroying the New World Order"
THANK YOU FOR SUPPORTING THE SITE!
© 2024 Created by truth. Powered by
You need to be a member of 12160 Social Network to add comments!
Join 12160 Social Network